Jobsite Inspection
Before beginning this underpinning project, the jobsite is inspected & the foundation repair plan is reviewed.
After Underpinning
After the foundation support piers were backfilled.
Installed Support Pier
One of the piers after being installed, but before being backfilled.
Foundation Support Pier
These foundation support piers address foundation settlement.
Underpin for the Win
Once installed, the piers are lifted to the highest practical limit as indicated on the foundation repair plan.
Exterior Crack in Blockwork
Exterior cracking in brick or blockwork is a common symptom of foundation movement.
Before Underpinning
The work area before we began the foundation underpinning project on this Tucson, Arizona home.
Drywall Cracks
Drywall cracks are a common sign of stress, or symptom of a potential foundation problem.
Diagonal Cracks in Drywall
Sometimes, interior wall cracks may form diagonally at the corners of doors & windows.
2D Topographical Map
A floor level survey was completed as part of the Forensic Foundation Inspection (Level B Foundation Inspection). The result of this report indicated a pattern of foundation settlement.