Foundation Repair Photo Album: Dry Cleaner Perchlorates Remediation Case Study
For several years now, we have been installing the MoistureLevel Smart Foundation System for different applications, including moisture vapor transmission through slabs on grade, benzene removal, and Dry Cleaner perc removal!
It seems fairly common the many dry cleaners end up have some amount of VOC’s accidentally spilled below the slab on grade. While this poses obvious environmental risks, the most immediate risk is to the staff working in the facility being exposed to known carcinogens.
Many solutions involve shutting the facility down, removal and replacement of the floor slab and the soil underneath. This process is expensive and time consuming, putting the people out of work that need protection for a great deal of time.
We have developed a number of technologies that facilitate tunneling under an existing slab on grade foundation to install intake extraction airways to help facilitate airflow needed for chemical extraction. The designing engineering was done by Partner ESI.
Once the system was up and functioning, testing of the exhaust could determine the amount of VOC’s being extracted. At first the levels were significant. Over time we expect them to drop. This system is ideal for extracting perchlorates because the engineers tell me that they tends to stay near the surface as opposed to some chemicals that might have more of a tendency to sink to lower elevations.
I can’t help but wonder how many of the thousands of existing dry cleaner personnel could be protected with our systems. What we have learned is that the MoistureLevel Smart Foundation System is not just great for foundation heave (resulting from expansive clay soils) & radon, but for a number of vapor / air quality concerns!
Production Photo - Dry Cleaner Perchlorates Remediation Case Study
Preparing the area for the horizontal intake installation
Production Photo - Dry Cleaner Perchlorates Remediation Case Study
After - MoistureLevel on the rooftop for the Dry Cleaner Perchlorates Remediation
Production Photo - Dry Cleaner Perchlorates Remediation Case Study
Horizontal intakes installed
Production Photo - Dry Cleaner Perchlorates Remediation Case Study
Horizontal boring equipment
Production Photo - Dry Cleaner Perchlorates Remediation Case Study
The concrete was removed at all of the horizontal boring locations. After that the locations were excavated down to accommodate the horizontal boring machine.
Repair Plan - Dry Cleaner Perchlorates Remediation Case Study
Repair plan - individual installation
Repair Plan - Dry Cleaner Perchlorates Remediation Case Study