PolyLevel Installation Process: Identifying The Affected Area
The first step is to identify the affected area and let everyone know by placing those orange cones on the driveway.
PolyLevel Installation Process: Time to Lift
As shown in this picture, the gap between the two concrete slabs is very notorious.
After PolyLevel
As shown in this photo, the concrete slabs are even now, and the tripping hazard is gone.
PolyLevel Installation Process: Injecting Time
Once all the holes got drilled, our foundation expert will slowly inject the foam material since it takes 15 minutes to fully expand and do the concrete lifting.
PolyLevel Installation Process: Drilling Time
The following step is to drill holes in the affected area and mark each of those holes with these plastic PolyLevel needles where the Polyfoam will eventually get injected and start the concrete lifting process.